serioconsulting.com
Reconstructing PS Availability Control for Easier Cost Control With CJBN » Serio Consulting
If you want to have a disciplined strategy around project cost controls (and in CO in general), then you'll want to make sure your budget and commitment values are correct. Similarly, you'll want to consistently repair your availability control values to ensure that your budget tolerances aren't being exceeded. Read this blog to see how CJBN builds on the same concept and data from CJEN.
Nathan Genez